Duct Bank Project
In addition to the trenching required for the new water and sewer mains, campus was torn up by smaller trenching needed to create an improved system for voice and data transmission. After the conduit was laid, fibre optic cable and telecommunications lines were pulled through the conduit and connected to campus buildings. The result is increased capacity and speed for the transmission of data throughout campus and via the Internet.